0% finance available on all home EV charge points

0% finance available on all home EV charge points

Fully installed electric car charging points
FROM
ONLY
£999*
* based on fast 7.4Kw thethered charger with OZEV grant (price includes £100 special discount while stocks last)
Grant price from £649**
With free 3-year warranty

**Includes £350 home charging point grant, which is available for rentals or apartment / flat owners only. Click here for our terms.

RANGE OF PRODUCTS AVAILABLE

14 Day Installation Guarantee From Approval

3-year warranty

Fast & convenient installation

Finance options to suit you

Fastest charge points available

Why Evolution Solutions?

Immediate installations available

Own dedicated EV charge point installers

Rated 'Excellent' on Trustpilot

What our customers say on Trustpilot

Congratulations on choosing to install a home EV charger – 0% finance is available.

There is also a £350 home charging point grant available for rental properties or apartment / flat ownership. If you qualify we’ll help you apply.

We provide a range of home EV charge points, including: Wallbox Pulsar Plus / Easee One / Sync EV / Pod-Point Solo 3 / Hypervolt / Zappi / Andersen / Wallbox Pulsar Max

Get a free survey and quote

We cover the following areas: Lancashire, South Cumbria, Greater Manchester, Merseyside, West Yorkshire and South Yorkshire.

"*" indicates required fields

Consent*
0
0
Your Cart
Your cart is emptyReturn to Shop

Electric Vehicle Homecharge Scheme

The scheme is currently open to applicants that:

  1. Rent their house or bungalow.
  2. Own or rent an apartment / flat.
  3. Are the landlord of a domestic rental property.
  4. Are a social housing provider.
  5. Has dedicated off-road parking at the property.
  6. Own or have ordered a qualifying vehicle.
  7. Have not previously claimed an OLEV grant.

Not sure if you are eligible?

Contact us to discuss your individual requirements.

Standard installation terms

  1. Fitting of an EV charger on a brick wall, or to another suitable permanent structure.
  2. Up to 10 metres of cable, run and neatly clipped to the wall between the electricity supply meter/distribution board and the charging unit.
  3. Supply meter/distribution board on the inside of an outside wall.
  4. Routing the cable through a drilled hole in a wall up to 500mm thick (if required).
  5. Fitting & testing of electrical connections & protections required for the EV charger.
  6. An additional three-way consumer unit (if required).
  7. Installation of a Type C MCB and a Type A RCD or a type A RCBO.
  8. No groundworks 

Not standard installation?

Contact us to discuss your individual requirements.