Meet our team

Paul
Director
Calum
Director
Michelle
Office Manager
Paul
Head of Technical
Alex
Sales Advisor
Nikki
Office Administrator
Ash
Installer
Daniel
Installer & Field Supervisor
Conor
Installer (Yorks)
Alan
North-West installer

What makes us different?

As a consumer lifestyle retail business, we're focused solely on installing electric vehicle chargers and nothing else.

We don’t fit lights, do rewires or employ contractors, we are dedicated to solely installing electric vehicle chargers at homes and workplaces, using our own directly employeed (no sub-contractors) and highly trained installers. Making us the EV charge point industry experts.

How does this benefit our customers?

In three very important ways:

Being EV charger installation experts with our own directly employed highly trained installers (no sub-contractors) allows us to provide guaranteed (14-day from approval) installation times, coupled with safe rigorous installation processes for certainty and peace of mind.

Because installing EV chargers is all do, we’ve used our expertise to collate a range of the best EV chargers (chosen for functionality and aesthetic design), and we’ll help you decide the right solution for you.

In-conjunction to being approved to install the leading charge points, we’re also accredited by the UK government (OZEV) to manage the full range of grant applications for domestic and workplace EV charger installations too.

0
0
Your Cart
Your cart is emptyReturn to Shop

Electric Vehicle Homecharge Scheme

The scheme is currently open to applicants that:

  1. Rent their house or bungalow.
  2. Own or rent an apartment / flat.
  3. Are the landlord of a domestic rental property.
  4. Are a social housing provider.
  5. Has dedicated off-road parking at the property.
  6. Own or have ordered a qualifying vehicle.
  7. Have not previously claimed an OLEV grant.

Not sure if you are eligible?

Contact us to discuss your individual requirements.

Standard installation terms

  1. Fitting of an EV charger on a brick wall, or to another suitable permanent structure.
  2. Up to 10 metres of cable, run and neatly clipped to the wall between the electricity supply meter/distribution board and the charging unit.
  3. Supply meter/distribution board on the inside of an outside wall.
  4. Routing the cable through a drilled hole in a wall up to 500mm thick (if required).
  5. Fitting & testing of electrical connections & protections required for the EV charger.
  6. An additional three-way consumer unit (if required).
  7. Installation of a Type C MCB and a Type A RCD or a type A RCBO.
  8. No groundworks 

Not standard installation?

Contact us to discuss your individual requirements.